Skip to content
WPJ International
Private label perfume manufacturer · since 1997

Your perfume brand in production within 90 days.

Full private label service - formula, bottle, label, documentation, shelf-ready delivery. Almost 30 years of expertise, our own GMP facility in Kraków, MOQ from 1 unit.

  • Brief + fragrance samples - free
  • Itemised quote once we have your brief
  • Full CPNP documentation included
  • No hidden costs or change fees

Trusted by 200+ brands across the EU, UK, USA and the Middle and Far East.

Get your brief + samples

Leave your contact info and a few words about the project. We'll get back to you.

RODO

What are we making?

  • ~30

    years on the market

  • 200+

    brands launched

  • 5MLN+

    products per year

  • ~100

    employees

  • GMP

    ISO + EU compliance

What you get

A full factory under your brand - without owning a factory.

You don't outsource pieces to different vendors. With us - one contract, one invoice, one accountable team at every stage.

  • 01

    Fragrance formula

    Access to 5,000+ compositions plus original work from our perfumers. Built on extracts from French Grasse and the leading European libraries.

  • 02

    Packaging & artwork

    Bottle, atomiser, dispenser, carton, label - graphic design done by our in-house team. Personalisation from 1 unit.

  • 03

    CPNP documentation

    Full compliance with EU 1223/2009. CPNP registration, safety reports, allergen lists - all included in the production price.

  • 04

    Logistics & warehouse

    Bulk packing, door-to-door shipping, on-site warehousing for up to 3 months. EU shipments without VAT.

Process in 5 steps

From brief to shelf - 90 days.

The stages run in sequence and each one is clearly written into the contract. You always know when you pay, what you get and what comes next.

  1. 01

    Brief & quote

    Fill in a short form. A dedicated project manager reaches out with questions, so we can put together a baseline quote.

  2. 027 days

    Fragrance samples

    We ship samples matched to your brief. We refine the formula until you sign off - no iteration limit.

  3. 032-3 wks

    Design phase

    Only once the formula is approved does design start: bottle, label, carton, component selection. It closes with your sign-off.

  4. 048-12 wks

    Production & CPNP

    With the design closed, production starts - and full CPNP registration and documentation run in parallel with it.

  5. 051-2 wks

    Delivery

    Bulk packing, door-to-door shipping to your address or to a fulfilment warehouse in PL/DE/UK.

Why not Asia, why not the average factory

WPJ vs. the rest of the market.

A short comparison of what you'll hear from us vs. a typical European manufacturer vs. an Asian distributor.

MOQ from first unit

  • WPJ International

    Yes, from 1 unit
  • Typical manufacturer

    Usually 2,000+
  • Distributor / Asia

    5,000-10,000+

Brief to production

  • WPJ International

    8-12 weeks
  • Typical manufacturer

    12-20 weeks
  • Distributor / Asia

    16-28 weeks

Full CPNP documentation

  • WPJ International

    Included
  • Typical manufacturer

    Add-on €700-€1,800
  • Distributor / Asia

    Not included - your problem

Communication

  • WPJ International

    Dedicated project manager
  • Typical manufacturer

    Polish
  • Distributor / Asia

    English only, time zones

Own facility

  • WPJ International

    Yes, GMP, Kraków
  • Typical manufacturer

    Often outsourced
  • Distributor / Asia

    No oversight

Our facility

Three production lines. Your run goes on the right one.

We don't subcontract production. Everything is made in our own GMP facility near Kraków, and the line is chosen by the size and complexity of your run - not the other way round.

01

Automated lines

High-throughput lines for runs that already sell. Bottle-after-bottle repeatability, on every repeat order.

100K+

Runs on this line

02

Semi-automated lines

Flexible lines for first and mid-size runs. Configurable around an unusual bottle, atomiser or dispenser.

5-50K

Typical first run

03

Manual lines

Hand assembly for capsule drops, market tests and limited editions - including when you need single units.

FROM 1

MOQ on this line

Compliance & certification

The paperwork every distributor will ask you for.

A perfume without full documentation will not reach an EU shelf. Compliance sits on our side and inside the production price - no surcharge, no hunting for an external safety assessor.

  • GMP

    Good Manufacturing Practice - ISO 22716

  • ISO 9001

    Quality management system

  • CPNP

    Cosmetic Products Notification Portal - EU

  • Reg. 1223/2009

    Full compliance with the EU regulation

  • REACH

    Chemical substance safety

  • SMETA

    Ethical and responsible production processes

Frequently asked questions

Yes, this applies to you too.

Specific answers to the questions that come up before a first production run - with numbers, not generalities.

Next step

30 minutes with our project manager.

Leave your contact info. We'll call, walk through your idea and ship fragrance samples matched to your brief. All free.

  • We answer every enquiry
  • NDA na życzenie · GDPR/RODO compliant

Or call us directly:

What are we making?